Working from the architect’s drawings, our technical team produced detailed manufacturing drawings that translated the design intent into buildable components. Every piece of joinery was manufactured in our Honley facility before being transported and installed on site.
The programme was tight. Match day commitments meant access windows were limited and the installation had to be sequenced carefully around the stadium’s operational calendar. We didn’t miss a single deadline.